A carpenter is preparing to install rigid insulation over the exterior sheathing of a house before applying siding. The local building code requires a continuous air barrier. What is the most effective method to ensure the rigid insulation also functions as a part of the continuous air barrier assembly?
For rigid insulation to function as an effective air barrier, all joints, edges, and penetrations must be sealed with appropriate tapes and sealants. Overlappin
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is preparing to install rigid insulation over the exterior sheathing of a house before applying siding. The local building code requires a continuous air barrier. What is the most effective method to ensure the rigid insulation also functions as a part of the continuous air barrier assembly?
Answer options:
- Overlap the joints of the rigid insulation by at least 50 mm. ✅ Apply tapes and sealants to all joints and penetrations of the rigid insulation.
- Fasten the rigid insulation with extra nails to prevent air movement.
- Install a separate sheet of polyethylene over the rigid insulation.
Correct answer: Apply tapes and sealants to all joints and penetrations of the rigid insulation.
Explanation: For rigid insulation to function as an effective air barrier, all joints, edges, and penetrations must be sealed with appropriate tapes and sealants. Overlapping joints is insufficient on its own, extra fasteners don't create an air seal, and a separate poly sheet would be redundant if the rigid insulation itself is acting as the air barrier.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.