Carpenter Red Seal Exam Prep · Question
A carpenter is operating a table saw to rip several sheets of plywood. After making a cut, the piece of plywood kicks back violently, striking the carpenter's leg. What is the most likely cause of this kickback?
Kickback on a table saw is most commonly caused by the workpiece becoming pinched between the blade and the rip fence, which can happen if the fence is not perf
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is operating a table saw to rip several sheets of plywood. After making a cut, the piece of plywood kicks back violently, striking the carpenter's leg. What is the most likely cause of this kickback?
Answer options:
- The blade was dull and needed sharpening. ✅ The rip fence was misaligned with the blade, pinching the workpiece.
- The saw's motor was underpowered for the thickness of the plywood.
- The dust collection system was not turned on.
Correct answer: The rip fence was misaligned with the blade, pinching the workpiece.
Explanation: Kickback on a table saw is most commonly caused by the workpiece becoming pinched between the blade and the rip fence, which can happen if the fence is not perfectly parallel to the blade or if the operator forces the wood into an angled fence. This causes the blade's teeth to grab and propel the wood backward. A dull blade might cause burning or slow cutting, but not typically violent kickback.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.