Carpenter Red Seal Exam Prep · Question
A carpenter is working from a fully assembled and inspected mobile scaffold tower that is 6 metres high. The scaffold is equipped with castor wheels. Before moving the scaffold to a new position along the building wall, what critical safety step must be performed?
According to safety regulations (e.g., CSA Z797), a mobile scaffold must not be moved while any person or materials are on the platform, as this creates a signi
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is working from a fully assembled and inspected mobile scaffold tower that is 6 metres high. The scaffold is equipped with castor wheels. Before moving the scaffold to a new position along the building wall, what critical safety step must be performed?
Answer options:
- Ensure all tools are on the platform to avoid multiple trips. ✅ Verify that no one is on the scaffold platform at the time of movement.
- Lower the platform to the lowest possible height to improve stability.
- Remove all bracing and outriggers to facilitate easier movement.
Correct answer: Verify that no one is on the scaffold platform at the time of movement.
Explanation: According to safety regulations (e.g., CSA Z797), a mobile scaffold must not be moved while any person or materials are on the platform, as this creates a significant risk of overturning, particularly for higher scaffolds. Lowering the platform might improve stability, but the primary rule is to clear the platform.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.