Carpenter Red Seal Exam Prep · Question
A carpenter is preparing to set up the formwork for a building's strip footings. The site has been excavated, and a layer of granular fill has been placed and compacted. What is the main reason for placing a 'mud slab' or 'working slab' (if required by design) directly on the granular fill before setting footing forms?
A mud slab (or working slab) provides a clean, level, and stable surface, which simplifies the accurate placement of rebar and the construction of footing formw
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is preparing to set up the formwork for a building's strip footings. The site has been excavated, and a layer of granular fill has been placed and compacted. What is the main reason for placing a 'mud slab' or 'working slab' (if required by design) directly on the granular fill before setting footing forms?
Answer options:
- To serve as a permanent waterproofing layer ✅ To provide a clean, level, and stable surface for rebar placement and formwork setup
- To increase the overall bearing capacity of the soil
- To insulate the footings from frost penetration
Correct answer: To provide a clean, level, and stable surface for rebar placement and formwork setup
Explanation: A mud slab (or working slab) provides a clean, level, and stable surface, which simplifies the accurate placement of rebar and the construction of footing formwork on uneven or soft subgrade conditions. It is not its primary role to waterproof, increase bearing capacity, or insulate, though it can offer minor incidental benefits.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.