Carpenter Red Seal Exam Prep · Question
A carpenter is estimating the cost to install 65 square metres of hardwood flooring. The flooring material costs $48.00 per square metre. Adhesive and underlayment costs $9.50 per square metre. Labour is charged at $75.00 per hour, and it is estimated to take 0.25 hours per square metre for installation. What is the total estimated material cost for this project?
The total material cost includes both the flooring material and the adhesive/underlayment. This is calculated as (65 m² * $48.00/m²) + (65 m² * $9.50/m²) = $312
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is estimating the cost to install 65 square metres of hardwood flooring. The flooring material costs $48.00 per square metre. Adhesive and underlayment costs $9.50 per square metre. Labour is charged at $75.00 per hour, and it is estimated to take 0.25 hours per square metre for installation. What is the total estimated material cost for this project?
Answer options:
- $3120.00 ✅ $3737.50
- $1218.75
- $4956.25
Correct answer: $3737.50
Explanation: The total material cost includes both the flooring material and the adhesive/underlayment. This is calculated as (65 m² * $48.00/m²) + (65 m² * $9.50/m²) = $3120.00 + $617.50 = $3737.50. The labour cost is not part of the material cost.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.