Carpenter Red Seal Exam Prep · Question
A small renovation company is bidding on a kitchen remodel. They estimate the direct material costs at $12,500 and direct labour costs at $7,800. Their overhead rate is 20% of direct costs, and they aim for a profit margin of 10% on the total estimated cost (including overhead). What is the final bid price for the kitchen remodel?
First, sum direct costs: $12,500 (materials) + $7,800 (labour) = $20,300. Calculate overhead: $20,300 * 0.20 = $4,060. The total cost (direct + overhead) is $20
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A small renovation company is bidding on a kitchen remodel. They estimate the direct material costs at $12,500 and direct labour costs at $7,800. Their overhead rate is 20% of direct costs, and they aim for a profit margin of 10% on the total estimated cost (including overhead). What is the final bid price for the kitchen remodel?
Answer options:
- $20,300.00
- $24,360.00 ✅ $26,800.00
- $29,060.00
Correct answer: $26,800.00
Explanation: First, sum direct costs: $12,500 (materials) + $7,800 (labour) = $20,300. Calculate overhead: $20,300 * 0.20 = $4,060. The total cost (direct + overhead) is $20,300 + $4,060 = $24,360. To achieve a 10% profit on the total estimated cost, the total cost represents 90% of the bid price (100% - 10% profit). So, the bid price is $24,360 / 0.90 = $27,066.67. Option C is the closest within rounding. (Note: The profit calculation is often a markup on total cost, not a percentage of the final price, which can lead to slight variations depending on how 'profit margin' is interpreted by the company). Re-calculating using a profit margin of 10% on the total cost ($24,360 * 1.10 = $26,796), Option C is the best fit.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.