A surveyor has provided control points for a new commercial building layout. One point is labelled 'BM 100.00'. What does 'BM' most likely signify in this context for a carpenter setting foundation forms?

BM stands for Bench Mark, which is a permanent or semi-permanent point of known elevation used as a reference for vertical control across a construction site. '

Start free practice for Carpenter Red Seal Exam Prep

300 questions · no signup required · 40 free questions per day

Start Practice →

Question: A surveyor has provided control points for a new commercial building layout. One point is labelled 'BM 100.00'. What does 'BM' most likely signify in this context for a carpenter setting foundation forms?

Answer options:

  • Base Material for the concrete slab.
  • Boundary Marker for the property line. ✅ Bench Mark, indicating a vertical elevation reference.
  • Building Model, referring to the digital design.

Correct answer: Bench Mark, indicating a vertical elevation reference.

Explanation: BM stands for Bench Mark, which is a permanent or semi-permanent point of known elevation used as a reference for vertical control across a construction site. '100.00' represents its elevation relative to a geodetic datum or an assumed project datum.

Start free practice for Carpenter Red Seal Exam Prep

300 questions · no signup required · 40 free questions per day

Start Practice →

More about Carpenter Red Seal Exam Prep

Related Questions

More for Carpenter Red Seal Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Carpenter Red Seal Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.