Carpenter Red Seal Exam Prep · Question
When framing a gable end wall for a roof with an overhang, what structural component extends past the exterior wall to support the roof sheathing at the eave?
Lookout rafters (or simply 'lookouts') are short framing members that extend from the gable end wall into the roof plane, cantilevered over the top plate, to su
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: When framing a gable end wall for a roof with an overhang, what structural component extends past the exterior wall to support the roof sheathing at the eave?
Answer options: ✅ A lookout rafter
- A cantilevered gable stud
- An outrigger
- A fascia board
Correct answer: A lookout rafter
Explanation: Lookout rafters (or simply 'lookouts') are short framing members that extend from the gable end wall into the roof plane, cantilevered over the top plate, to support the roof sheathing and maintain a consistent eave line.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.