Which statement best describes the primary function of an air barrier in a building envelope?
The primary function of an air barrier is to control the unintentional movement of air (bulk airflow) across the building envelope. This prevents heat loss/gain
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: Which statement best describes the primary function of an air barrier in a building envelope?
Answer options:
- To prevent the migration of moisture vapour through diffusion ✅ To resist the bulk flow of air into and out of the building
- To provide a continuous layer of thermal resistance
- To drain incidental water that penetrates the exterior cladding
Correct answer: To resist the bulk flow of air into and out of the building
Explanation: The primary function of an air barrier is to control the unintentional movement of air (bulk airflow) across the building envelope. This prevents heat loss/gain through convection and reduces moisture transport.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.