Carpenter Red Seal Exam Prep · Question
A carpenter is constructing a floor with a concentrated load from an interior pony wall above, coinciding with the mid-span of several joists. What is the most effective method, according to the NBC, to strengthen the joists in this localized area to prevent excessive deflection or failure?
For concentrated loads, doubling or even tripling joists, or using an engineered beam under the load, is the standard and most effective practice to distribute
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A carpenter is constructing a floor with a concentrated load from an interior pony wall above, coinciding with the mid-span of several joists. What is the most effective method, according to the NBC, to strengthen the joists in this localized area to prevent excessive deflection or failure?
Answer options:
- Increase the joist spacing in that area
- Install blocking between the joists at the load point only ✅ Double the joists under the pony wall and extend them sufficiently
- Switch to a higher grade of lumber for the affected joists
Correct answer: Double the joists under the pony wall and extend them sufficiently
Explanation: For concentrated loads, doubling or even tripling joists, or using an engineered beam under the load, is the standard and most effective practice to distribute the load and increase the load-carrying capacity, as specified by the NBC and good engineering practice.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses