Carpenter Red Seal Exam Prep · Question
A worker is installing cladding at a height of 3.8 metres above a concrete slab. The work area is unobstructed below. As per BC WSBC regulations, what is the minimum required height at which fall protection must be used if a conventional fall arrest system is chosen?
BC WSBC OHS Regulation 11.2 (1) requires fall protection when an unenclosed work area is 3 metres or more above a surface to which a worker could fall, but spec
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A worker is installing cladding at a height of 3.8 metres above a concrete slab. The work area is unobstructed below. As per BC WSBC regulations, what is the minimum required height at which fall protection must be used if a conventional fall arrest system is chosen?
Answer options: ✅ 2.4 metres
- 3.0 metres
- 3.5 metres
- 7.5 metres
Correct answer: 2.4 metres
Explanation: BC WSBC OHS Regulation 11.2 (1) requires fall protection when an unenclosed work area is 3 metres or more above a surface to which a worker could fall, but specifies 2.4 metres for construction work areas.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.