A renovator is installing a new wall to divide an existing open-concept industrial unit (Group F, Division 2 occupancy) into two separate tenant spaces. What is the minimum required fire-resistance rating for this new demising wall, according to NBC 2020?

According to NBC 2020 Table 3.2.2.4., a fire separation between separate major occupancies or between tenant spaces (when not specified otherwise) typically req

Start free practice for Carpenter Red Seal Exam Prep

300 questions · no signup required · 40 free questions per day

Start Practice →

Question: A renovator is installing a new wall to divide an existing open-concept industrial unit (Group F, Division 2 occupancy) into two separate tenant spaces. What is the minimum required fire-resistance rating for this new demising wall, according to NBC 2020?

Answer options:

  • 30 minutes
  • 45 minutes ✅ 1 hour
  • 2 hours

Correct answer: 1 hour

Explanation: According to NBC 2020 Table 3.2.2.4., a fire separation between separate major occupancies or between tenant spaces (when not specified otherwise) typically requires a 1-hour fire-resistance rating.

Start free practice for Carpenter Red Seal Exam Prep

300 questions · no signup required · 40 free questions per day

Start Practice →

More about Carpenter Red Seal Exam Prep

Related Questions

More for Carpenter Red Seal Exam Prep candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Carpenter Red Seal Exam Prep Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.