A construction site has a temporary ramp for wheeled equipment. The ramp changes elevation by 1.5 metres. According to CCOHS guidance and common provincial OHS regulations (e.g., Ontario), what is the maximum recommended slope (rise:run) for a temporary construction ramp?
CCOHS and various OHS regulations recommend a maximum slope of 1:8 for temporary ramps to ensure safe passage for wheeled equipment and to prevent tipping, espe
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A construction site has a temporary ramp for wheeled equipment. The ramp changes elevation by 1.5 metres. According to CCOHS guidance and common provincial OHS regulations (e.g., Ontario), what is the maximum recommended slope (rise:run) for a temporary construction ramp?
Answer options:
- 1 in 5 (1:5) ✅ 1 in 8 (1:8)
- 1 in 10 (1:10)
- 1 in 12 (1:12)
Correct answer: 1 in 8 (1:8)
Explanation: CCOHS and various OHS regulations recommend a maximum slope of 1:8 for temporary ramps to ensure safe passage for wheeled equipment and to prevent tipping, especially when carrying loads.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.