Carpenter Red Seal Exam Prep · Question
A grade stake indicates 'Cut 300 mm'. What does this mean for the excavator operator?
'Cut 300 mm' indicates that 300 mm of material needs to be removed from the existing ground level at that stake's location to reach the designed finished grade.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A grade stake indicates 'Cut 300 mm'. What does this mean for the excavator operator?
Answer options: ✅ Excavate 300 mm down from the top of the stake to reach the final grade
- Add 300 mm of fill to reach the final grade
- The final grade is 300 mm above the top of the stake
- The stake should be cut shorter by 300 mm
Correct answer: Excavate 300 mm down from the top of the stake to reach the final grade
Explanation: 'Cut 300 mm' indicates that 300 mm of material needs to be removed from the existing ground level at that stake's location to reach the designed finished grade. The stake itself acts as the reference point for the initial cut.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.