When constructing a new residential basement in Alberta, which strategy would provide the most effective air sealing at the rim joist area to meet current building code expectations while preventing moisture issues?
Sealing the rim joist with acoustical sealant addresses air leakage, and then a continuous 6-mil poly vapour barrier, properly taped and sealed, prevents moistu
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: When constructing a new residential basement in Alberta, which strategy would provide the most effective air sealing at the rim joist area to meet current building code expectations while preventing moisture issues?
Answer options: ✅ Sealing the perimeter of the rim joist with acoustical sealant and covering the entire area with a 6-mil poly vapour barrier taped and sealed.
- Installing unfaced fibreglass batt insulation snugly fitted into the cavity, with no additional sealing.
- Applying closed-cell spray foam directly to the rim joist, sealing all gaps and then covering with 6-mil poly.
- Using rigid insulation board tightly fitted against the rim joist, without sealing the gaps around it.
Correct answer: Sealing the perimeter of the rim joist with acoustical sealant and covering the entire area with a 6-mil poly vapour barrier taped and sealed.
Explanation: Sealing the rim joist with acoustical sealant addresses air leakage, and then a continuous 6-mil poly vapour barrier, properly taped and sealed, prevents moisture migration. This combination provides both air and vapour control, which is the most effective and code-compliant approach when not using spray foam.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.