According to the NBC 2020 and best practices for cold climates like Northern Ontario, where should the primary vapour barrier typically be located within a wall assembly of a residential dwelling?
In cold climates, the primary vapour barrier should be located on the warm-in-winter side of the insulation, which is typically directly behind the interior fin
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: According to the NBC 2020 and best practices for cold climates like Northern Ontario, where should the primary vapour barrier typically be located within a wall assembly of a residential dwelling?
Answer options:
- On the exterior side of the exterior sheathing.
- Centered within the wall cavity between two layers of insulation. ✅ On the warm-in-winter side of the insulation, typically behind the interior finish.
- Integrated into the exterior air barrier system.
Correct answer: On the warm-in-winter side of the insulation, typically behind the interior finish.
Explanation: In cold climates, the primary vapour barrier should be located on the warm-in-winter side of the insulation, which is typically directly behind the interior finish (e.g., gypsum board). This prevents warm, moist indoor air from migrating into the wall assembly and condensing on colder surfaces.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.