During a renovation, you need to remove a 3.0 m section of a wall on the main floor of a two-storey house. There's a parallel joist system above, and you observe a double top plate spanning the opening. This wall runs perpendicular to the ceiling joists. What is the MOST appropriate initial assessment regarding its load-bearing capacity?
A wall running perpendicular to ceiling joists, especially in a multi-storey building, is a strong indicator of a load-bearing wall, as it's designed to transfe
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: During a renovation, you need to remove a 3.0 m section of a wall on the main floor of a two-storey house. There's a parallel joist system above, and you observe a double top plate spanning the opening. This wall runs perpendicular to the ceiling joists. What is the MOST appropriate initial assessment regarding its load-bearing capacity?
Answer options:
- It is definitely load-bearing and requires temporary shoring.
- It is likely non-load-bearing due to the double top plate, indicating a partition. ✅ It is likely load-bearing because it runs perpendicular to the joists and supports a second storey.
- It is impossible to determine without an engineer's assessment.
Correct answer: It is likely load-bearing because it runs perpendicular to the joists and supports a second storey.
Explanation: A wall running perpendicular to ceiling joists, especially in a multi-storey building, is a strong indicator of a load-bearing wall, as it's designed to transfer loads from above. Its removal would require engineered temporary shoring to prevent structural collapse. Initial assessment should err on the side of caution.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.