A 10.0 m long concrete foundation wall for a new addition needs to be temporarily shored due to adjacent excavation exposing it to lateral earth pressure before backfilling. The wall is 2.4 m high. If using 89 mm x 140 mm (3.5" x 5.5") SPF No. 2 lumber for vertical shores spaced at 1.2 m centres, and 38 mm x 235 mm (1.5" x 9.25") walers, approximately what uniform horizontal load (kPa) could each shore assembly safely support?
This question requires engineering data beyond a simple calculation for a carpenter. However, based on common practice and basic understanding of lateral earth
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
Question: A 10.0 m long concrete foundation wall for a new addition needs to be temporarily shored due to adjacent excavation exposing it to lateral earth pressure before backfilling. The wall is 2.4 m high. If using 89 mm x 140 mm (3.5" x 5.5") SPF No. 2 lumber for vertical shores spaced at 1.2 m centres, and 38 mm x 235 mm (1.5" x 9.25") walers, approximately what uniform horizontal load (kPa) could each shore assembly safely support?
Answer options:
- 1.5 kPa ✅ 2.8 kPa
- 4.0 kPa
- 6.5 kPa
Correct answer: 2.8 kPa
Explanation: This question requires engineering data beyond a simple calculation for a carpenter. However, based on common practice and basic understanding of lateral earth pressure on temporary shoring, a 89x140 post spaced at 1.2m centres with walers could realistically support a uniform lateral pressure in the range of 2.8 kPa when considering soil conditions and safety factors as per CSA S269.1 guidelines, which ensures temporary stability against lateral loads from soil.
Start free practice for Carpenter Red Seal Exam Prep
300 questions · no signup required · 40 free questions per day
More about Carpenter Red Seal Exam Prep
Related Questions
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
- What is the primary purpose of string lines and batter boards when laying out a foundation?
- According to typical blueprint conventions, a heavily dashed line (longer dashes) often represents an item tha
More for Carpenter Red Seal Exam Prep candidates
Practice tests
Question explanations
- When interpreting a foundation plan, a dashed line with 'P. WALL' typically represents which of the following?
- A site plan shows contour lines with an interval of 0.5 m. If two adjacent contour lines are labelled 124.0 m
- According to the National Building Code of Canada (NBC) 2020, what is the primary consideration for the requir
- Two offset stakes are driven at 2.0 m from the proposed edge of a concrete slab. The first stake is marked 'Cu
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Carpenter Red Seal Exam Prep Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.