According to CAN/ULC-S537, who is responsible for performing a preliminary test before the formal verification begins?

CAN/ULC-S537-19 Clause 4.1.1 states the verification shall be performed only after the fire alarm system installation is complete and the contractor has conduct

Start free practice for CFAA Fire Alarm Technician

30 questions · no signup required · 40 free questions per day

Start Practice →

Question: According to CAN/ULC-S537, who is responsible for performing a preliminary test before the formal verification begins?

Answer options:

  • The Fire Department
  • The Electrical Inspector ✅ The Installing Contractor
  • The System Manufacturer

Correct answer: The Installing Contractor

Explanation: CAN/ULC-S537-19 Clause 4.1.1 states the verification shall be performed only after the fire alarm system installation is complete and the contractor has conducted a preliminary test.

Start free practice for CFAA Fire Alarm Technician

30 questions · no signup required · 40 free questions per day

Start Practice →

More about CFAA Fire Alarm Technician

Related Questions

More for CFAA Fire Alarm Technician candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free CFAA Fire Alarm Technician Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.