Skip to main content

Plumber Red Seal · Question

A plumber is roughing in the drainage for a commercial kitchen. The drainage system will include a floor drain with a 75 mm nominal pipe size and a grease interceptor. When calculating the total drainage fixture unit (DFU) load for this section, what DFU value should generally be assigned to a 75 mm floor drain with a grease interceptor as per the National Plumbing Code of Canada?

According to NPC Table 2.4.9.4.(1) (or similar provincial tables), a floor drain (commercial/industrial, 75 mm) connected to a grease interceptor is assigned a

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

Question: A plumber is roughing in the drainage for a commercial kitchen. The drainage system will include a floor drain with a 75 mm nominal pipe size and a grease interceptor. When calculating the total drainage fixture unit (DFU) load for this section, what DFU value should generally be assigned to a 75 mm floor drain with a grease interceptor as per the National Plumbing Code of Canada?

Answer options:

  • 2 DFU
  • 3 DFU
  • 4 DFU ✅ 5 DFU

Correct answer: 5 DFU

Explanation: According to NPC Table 2.4.9.4.(1) (or similar provincial tables), a floor drain (commercial/industrial, 75 mm) connected to a grease interceptor is assigned a drainage fixture unit value of 5 DFU. This value accounts for the potential heavy waste flow and the additional resistance from the interceptor.

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

More about Plumber Red Seal

Related Questions

More for Plumber Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Plumber Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.