Plumber Red Seal · Question

A new single-family dwelling is under construction. The plumber needs to install the main building drainage system. Before concealing the rough-in plumbing, which of the following inspections is typically required by the Authority Having Jurisdiction (AHJ)?

Before concealing rough-in plumbing, including drainage and venting systems, a 'Drainage and Venting Rough-in Inspection' is typically mandatory to ensure compl

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

Question: A new single-family dwelling is under construction. The plumber needs to install the main building drainage system. Before concealing the rough-in plumbing, which of the following inspections is typically required by the Authority Having Jurisdiction (AHJ)?

Answer options: ✅ Drainage and Venting Rough-in Inspection

  • Final Water Supply Inspection
  • Gas Piping Rough-in Inspection
  • Foundation Drainage Inspection

Correct answer: Drainage and Venting Rough-in Inspection

Explanation: Before concealing rough-in plumbing, including drainage and venting systems, a 'Drainage and Venting Rough-in Inspection' is typically mandatory to ensure compliance with the plumbing code and proper workmanship. The other options refer to different stages or systems: water supply, gas piping, and foundation drainage inspections are separate and typically occur at different times or for different aspects of the build.

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

More about Plumber Red Seal

Related Questions

More for Plumber Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Plumber Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.