A plumber has completed the above-ground rough-in of a new commercial building's drainage, waste, and vent (DWV) system. What type of inspection should be requested next by the plumber before concealing any of the work?

After the rough-in and before covering any pipes, a 'concealed plumbing inspection' (sometimes called a 'rough-in inspection') is required to ensure that the DW

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

Question: A plumber has completed the above-ground rough-in of a new commercial building's drainage, waste, and vent (DWV) system. What type of inspection should be requested next by the plumber before concealing any of the work?

Answer options:

  • A final plumbing inspection.
  • A backflow prevention device inspection. ✅ A concealed plumbing inspection.
  • A sewer connection inspection.

Correct answer: A concealed plumbing inspection.

Explanation: After the rough-in and before covering any pipes, a 'concealed plumbing inspection' (sometimes called a 'rough-in inspection') is required to ensure that the DWV system is installed correctly and to code. This inspection checks pipe sizing, slope, venting, and proper connection before the work is hidden.

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

More about Plumber Red Seal

Related Questions

More for Plumber Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Plumber Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.