Plumber Red Seal · Question

A plumber has completed the rough-in plumbing for a new commercial kitchen. Which inspection is typically requested before closing the walls and ceilings?

Before walls and ceilings are closed, a Drainage, Waste, and Vent (DWV) test and inspection (often a 'rough-in inspection') is typically performed. This inspect

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

Question: A plumber has completed the rough-in plumbing for a new commercial kitchen. Which inspection is typically requested before closing the walls and ceilings?

Answer options:

  • Final plumbing inspection ✅ Drainage, waste, and vent (DWV) test and inspection
  • Water service connection inspection
  • Backflow prevention device inspection

Correct answer: Drainage, waste, and vent (DWV) test and inspection

Explanation: Before walls and ceilings are closed, a Drainage, Waste, and Vent (DWV) test and inspection (often a 'rough-in inspection') is typically performed. This inspection verifies that all installed lines are correctly sloped, sized, connected, and pass a pressure test (air or water) to ensure they are leak-free and code-compliant before they become inaccessible. The final inspection occurs after fixtures are installed.

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

More about Plumber Red Seal

Related Questions

More for Plumber Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Plumber Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.