What is the standard hydrostatic (water) test pressure and duration for a new potable water supply system, according to the NPC?

The NPC generally requires a new water distribution system to be tested for leaks by subjecting it to a hydrostatic pressure of at least 1000 kPa (145 psi) for

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

Question: What is the standard hydrostatic (water) test pressure and duration for a new potable water supply system, according to the NPC?

Answer options:

  • 500 kPa (75 psi) for 30 minutes.
  • The working pressure of the system for 24 hours. ✅ 1000 kPa (145 psi) for 15 minutes.
  • Twice the system's static pressure for 1 hour.

Correct answer: 1000 kPa (145 psi) for 15 minutes.

Explanation: The NPC generally requires a new water distribution system to be tested for leaks by subjecting it to a hydrostatic pressure of at least 1000 kPa (145 psi) for a minimum of 15 minutes without any loss of pressure.

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

More about Plumber Red Seal

Related Questions

More for Plumber Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Plumber Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.