A vent stack is required to be connected to the base of a drainage stack with a yoke vent when the drainage stack serves storeys located above:

The NPC mandates yoke vents at intervals of not more than 10 storeys to relieve positive pressure that can build up at the base of a tall drainage stack, preven

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

Question: A vent stack is required to be connected to the base of a drainage stack with a yoke vent when the drainage stack serves storeys located above:

Answer options:

  • 3 storeys
  • 5 storeys ✅ 10 storeys
  • 12 storeys

Correct answer: 10 storeys

Explanation: The NPC mandates yoke vents at intervals of not more than 10 storeys to relieve positive pressure that can build up at the base of a tall drainage stack, preventing trap seal blow-out.

Start free practice for Plumber Red Seal

177 questions · no signup required · 40 free questions per day

Start Practice →

More about Plumber Red Seal

Related Questions

More for Plumber Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Plumber Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.