Refrigeration & Air Conditioning Mechanic Red Seal · Question

A refrigeration unit requires service to its evaporator fan motor. Before beginning work, the technician must disable and lock out the power source. Which of the following is the LAST step in a proper Lockout/Tagout (LOTO) procedure?

After locking and tagging, verifying isolation by attempting to start the equipment (or checking for stored energy) is the critical final step to ensure zero en

Start free practice for Refrigeration & Air Conditioning Mechanic Red Seal

500 questions · no signup required · 40 free questions per day

Start Practice →

Question: A refrigeration unit requires service to its evaporator fan motor. Before beginning work, the technician must disable and lock out the power source. Which of the following is the LAST step in a proper Lockout/Tagout (LOTO) procedure?

Answer options: ✅ Verify isolation by attempting to start the equipment

  • Place the lockout device and tag on the energy isolating device
  • Notify affected employees that energy will be isolated
  • Shut down the machinery or equipment

Correct answer: Verify isolation by attempting to start the equipment

Explanation: After locking and tagging, verifying isolation by attempting to start the equipment (or checking for stored energy) is the critical final step to ensure zero energy state before work begins.

Start free practice for Refrigeration & Air Conditioning Mechanic Red Seal

500 questions · no signup required · 40 free questions per day

Start Practice →

More about Refrigeration & Air Conditioning Mechanic Red Seal

Related Questions

More for Refrigeration & Air Conditioning Mechanic Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Refrigeration & Air Conditioning Mechanic Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.