A utility crew is performing maintenance on overhead power lines. Which of the following safety procedures is paramount before work can begin on de-energized lines?

Before working on de-energized high-voltage lines, it is crucial to confirm visible open points (disconnects) and apply personal protective grounds to bond the

Start free practice for Electrician Red Seal

150 questions · no signup required · 40 free questions per day

Start Practice →

Question: A utility crew is performing maintenance on overhead power lines. Which of the following safety procedures is paramount before work can begin on de-energized lines?

Answer options:

  • Ensuring all switches are closed to maintain system integrity. ✅ Confirming visible open points and applying personal protective grounds.
  • Directly touching the conductor to verify de-energization.
  • Relying solely on lockout tagout procedures without further verification.

Correct answer: Confirming visible open points and applying personal protective grounds.

Explanation: Before working on de-energized high-voltage lines, it is crucial to confirm visible open points (disconnects) and apply personal protective grounds to bond the conductors to a known ground. This ensures no accidental re-energization or induced voltage poses a hazard. Relying solely on lockout/tagout without physical verification and grounding is insufficient for high voltage systems.

Start free practice for Electrician Red Seal

150 questions · no signup required · 40 free questions per day

Start Practice →

More about Electrician Red Seal

Related Questions

More for Electrician Red Seal candidates

Ready to practice?

Free, no signup required. Build a wrong-question list as you go.

Start Free Electrician Red Seal Practice →

Related courses

Other Canadian certifications candidates often prepare for alongside this one.