Electrician Red Seal · Question
An electrician is responsible for installing a 100 A, 240 V circuit using 3 AWG copper conductors (T90 Nylon) to a detached garage. The cable will be run underground in a trench. Considering factors like conductor type, current rating, and environmental conditions, which of the following wiring methods is the most appropriate and compliant with the CEC for direct burial in wet locations and suitable for a 100 A feeder?
Teck90 cable is specifically designed for direct burial and wet locations, providing robust mechanical protection and suitable insulation for the application. N
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
Question: An electrician is responsible for installing a 100 A, 240 V circuit using 3 AWG copper conductors (T90 Nylon) to a detached garage. The cable will be run underground in a trench. Considering factors like conductor type, current rating, and environmental conditions, which of the following wiring methods is the most appropriate and compliant with the CEC for direct burial in wet locations and suitable for a 100 A feeder?
Answer options:
- NMD90 (Non-metallic sheathed cable)
- AC90 (Armoured cable)
- NMWU (Non-metallic jacketed cable for wet locations, underground) ✅ Teck90 (Armoured 'TEC' cable with integral jacket)
Correct answer: Teck90 (Armoured 'TEC' cable with integral jacket)
Explanation: Teck90 cable is specifically designed for direct burial and wet locations, providing robust mechanical protection and suitable insulation for the application. NMD90 and AC90 are not rated for direct burial or wet locations. NMWU is rated for direct burial but Teck90 offers superior mechanical protection against damage during and after installation, which is often preferred for feeders in direct burial applications.
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
More about Electrician Red Seal
Related Questions
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
- A Red Seal electrician is setting up temporary power for a construction site. The main temporary service is a
- A new industrial facility requires a 600 V, three-phase, 150 A feeder to supply a motor control centre. The co
More for Electrician Red Seal candidates
Practice tests
Question explanations
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Electrician Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.