An electrician is checking an existing service entrance for a dwelling. They notice the service mast extends 0.9 m (3 ft) above the roof surface. What is the minimum size of conduit required for this mast, according to CEC Rule 6-112(3) table?
CEC Rule 6-112(3) table specifies the minimum rigid conduit size for service masts based on the extension above the roof. For an extension of 0.9 m (3 ft), a mi
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
Question: An electrician is checking an existing service entrance for a dwelling. They notice the service mast extends 0.9 m (3 ft) above the roof surface. What is the minimum size of conduit required for this mast, according to CEC Rule 6-112(3) table?
Answer options:
- 32 mm (1 ¼ in.)
- 42 mm (1 ½ in.) ✅ 53 mm (2 in.)
- 63 mm (2 ½ in.)
Correct answer: 53 mm (2 in.)
Explanation: CEC Rule 6-112(3) table specifies the minimum rigid conduit size for service masts based on the extension above the roof. For an extension of 0.9 m (3 ft), a minimum conduit size of 53 mm (2 in.) is required. This rule ensures adequate mechanical strength of the mast.
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
More about Electrician Red Seal
Related Questions
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
- A Red Seal electrician is setting up temporary power for a construction site. The main temporary service is a
- A new industrial facility requires a 600 V, three-phase, 150 A feeder to supply a motor control centre. The co
More for Electrician Red Seal candidates
Practice tests
Question explanations
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Electrician Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.