A client requests a dedicated 20 A, 120 V receptacle for a new freezer in their utility room. The electrician plans to run a NMD90 cable from the panel. Which of the following is an essential requirement for this receptacle installation according to the CE Code, particularly regarding GFCI protection?
CE Code Rule 26-710(d) requires all receptacles in a utility room or laundry room to be GFCI protected. It makes no exception for dedicated circuits or freezers
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
Question: A client requests a dedicated 20 A, 120 V receptacle for a new freezer in their utility room. The electrician plans to run a NMD90 cable from the panel. Which of the following is an essential requirement for this receptacle installation according to the CE Code, particularly regarding GFCI protection?
Answer options:
- It must be GFCI protected as it's in a utility room. ✅ It must be GFCI protected if located within 1.5 m (5 ft) of a sink.
- It does not require GFCI protection unless subject to splashing.
- It is exempt from GFCI protection because it's a dedicated freezer circuit.
Correct answer: It must be GFCI protected if located within 1.5 m (5 ft) of a sink.
Explanation: CE Code Rule 26-710(d) requires all receptacles in a utility room or laundry room to be GFCI protected. It makes no exception for dedicated circuits or freezers; the proximity to water sources like sinks further emphasizes this.
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
More about Electrician Red Seal
Related Questions
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
- A Red Seal electrician is setting up temporary power for a construction site. The main temporary service is a
- A new industrial facility requires a 600 V, three-phase, 150 A feeder to supply a motor control centre. The co
More for Electrician Red Seal candidates
Practice tests
Question explanations
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Electrician Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.