During a routine inspection, a technician notices that the shading coil on an AC magnetic contactor's armature is broken. What is the likely operational consequence of this fault?
The shading coil in an AC contactor creates a phase lag in a portion of the magnetic flux, preventing the magnetic force from dropping to zero during the AC cyc
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
Question: During a routine inspection, a technician notices that the shading coil on an AC magnetic contactor's armature is broken. What is the likely operational consequence of this fault?
Answer options:
- The contactor will fail to close its main contacts. ✅ The contactor will hum or chatter excessively when energized.
- The contactor will operate silently but with reduced pulling force.
- The contactor's coil will draw excessive current and overheat.
Correct answer: The contactor will hum or chatter excessively when energized.
Explanation: The shading coil in an AC contactor creates a phase lag in a portion of the magnetic flux, preventing the magnetic force from dropping to zero during the AC cycle. A broken shading coil causes the contactor to hum or chatter as the armature attempts to hold in with an inconsistent magnetic field.
Start free practice for Electrician Red Seal
150 questions · no signup required · 40 free questions per day
More about Electrician Red Seal
Related Questions
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
- A Red Seal electrician is setting up temporary power for a construction site. The main temporary service is a
- A new industrial facility requires a 600 V, three-phase, 150 A feeder to supply a motor control centre. The co
More for Electrician Red Seal candidates
Practice tests
Question explanations
- A residential garage is to be wired with a 15 A, 120 V duplex receptacle. According to the Canadian Electrical
- During a renovation of a commercial kitchen, an electrician needs to replace an old single-phase, 240 V, 5 kW
- A commercial kitchen is being renovated, and several new 4 kW, 208 V, single-phase electric ovens are being in
- What is the minimum working space depth required in front of an electrical panel rated 200 A, 120/240 V, locat
Ready to practice?
Free, no signup required. Build a wrong-question list as you go.
Start Free Electrician Red Seal Practice →Related courses
Other Canadian certifications candidates often prepare for alongside this one.